The improvement works around Civic Way and Rink Drive focus on modernising transport routes, improving safety and supporting future town-centre development. These upgrades may include resurfacing, junction redesign, crossing improvements and updated road layouts.
During construction, temporary diversions and reduced traffic lanes may be in place, so drivers should allow extra time for journeys.
Access / Impact Times
Works typically take place during scheduled daytime periods
Traffic restrictions and timings may change on bank holidays or weekends — always follow on-site signage.
What People Like
- Long-term improvements to traffic flow
- Safer crossings and pedestrian areas
- Supports wider town-centre regeneration
What People Don’t Like
- Short-term disruption and delays
- Temporary diversions and parking changes
Local Tip
If possible, avoid peak-time travel through the works — alternative routes can save a fair bit of hassle.